REVOLUTIONARY INNOVATION:

The only continuous, no join, composite pipe construction that can be made on site.

COMPARE

Imagine a system that can construct a continuous pipe, up to 1.2 meters in diameter, with no joins, and on site. WNR Systems’ innovative machine uses the latest technology in composite pipes and can deliver any length or wall thickness, cured and ready to be used in less than 4 minutes. It can also make bespoke pipes to the exact specifications for the industry, fluid and surroundings. Read more...

CAPACITY

WNR Systems will produce in excess of 1,400 metres of pipeline per 8 hour shift or 3,400 metres each 24 hour shift with the machine only running at 80% of its capacity. It is envisaged that a maximum of 6 to 8 workers can operate the machine on site. Diameter reduction, bends, corners, shut off valves and IO’s can also be incorporated within the system. Read more ...

 

ENVIRONMENT

WNR Systems reduces the need of transport vehicles on the sea and road. Besides the machine, the only transport costs are the raw materials. Air pollution is minimised with  less diesel motors required to lay the pipe as opposed to the traditional method. The reduction in onsite activity is where this system is really outstanding. Read more...

© 2014 Created by WNR Systems